2.4 Timber Project

Following the field trip with staff and students that included a visit to Copford Sawmill, Stefano Santilli conceived the timber project : 2.4, based on using the standard 2.4 meter length of timber as a parameter.   BRIDGE funds were used to purchase a 2.4 metre/ 50cm diameter, length of ash for students in the wood workshop The challenge of the project is to minimise the amount of waste in the production process as much as possible. The project has provoked considerable interest and activity amongst the students and the outcomes will be presented as part of the BRIDGE Circus event at Grand Parade in December

 
Advertisements
This entry was posted in Wood. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s